
Bathroom renovation · 2023
Rosewood Ensuite
Rockcliffe Park
Overview
A primary ensuite taken back to the studs, re-waterproofed to a full-membrane system and rebuilt around a curbless shower and book-matched stone.
Heated stone floors, full re-waterproofing and a curbless walk-in shower.
Scope of work
- Strip-out to studs and subfloor levelling
- Full-membrane waterproofing and linear drainage
- Electric in-floor heating with smart thermostat
- Book-matched stone slabs and custom vanity
Project details
- Size
- 180 sq ft
- Duration
- 8 weeks
- Delivery
- Renovation
- Completed
- 2023
Planning something similar?
Tell us about your site and timeline. We'll come back with a clear, itemised estimate.
Request a quoteGallery
Rosewood Ensuite
Next project
Foundry Lane