AATLASCONSTRUCTION
Finished ensuite
All projects

Bathroom renovation · 2023

Rosewood Ensuite

Rockcliffe Park

Overview

A primary ensuite taken back to the studs, re-waterproofed to a full-membrane system and rebuilt around a curbless shower and book-matched stone.

Heated stone floors, full re-waterproofing and a curbless walk-in shower.

Scope of work

  • Strip-out to studs and subfloor levelling
  • Full-membrane waterproofing and linear drainage
  • Electric in-floor heating with smart thermostat
  • Book-matched stone slabs and custom vanity

Project details

Size
180 sq ft
Duration
8 weeks
Delivery
Renovation
Completed
2023

Planning something similar?

Tell us about your site and timeline. We'll come back with a clear, itemised estimate.

Request a quote

Gallery

Rosewood Ensuite

Next project

Foundry Lane

Heritage restoration