
Kitchen renovation · 2024
Kestrel Kitchen
The Glebe
Overview
A century home reworked around a single 22-foot steel beam, replacing three cramped rooms with one continuous kitchen, pantry and dining space.
Load-bearing wall removed to open a century home into one continuous kitchen.
Scope of work
- Structural steel beam and temporary shoring
- Full electrical and plumbing rough-in to code
- Custom matte black cabinetry and stone waterfall island
- Engineered oak flooring throughout the main level
Project details
- Size
- 640 sq ft
- Duration
- 14 weeks
- Delivery
- Renovation
- Completed
- 2024
Planning something similar?
Tell us about your site and timeline. We'll come back with a clear, itemised estimate.
Request a quoteGallery
Kestrel Kitchen
Next project
Northgate Offices